Former Florentine Building Abatement/Demolition

do you have a construction project we can help with?

Former Florentine Building Abatement/Demolition

Target provided ACM/ORM abatement and demolition/removal of an 8-story, 31,146 SF mixed-use residential and commercial building in a tight urban space located in downtown Florence, SC.

  • Prepared work plans (demo plan, APP, AHAs, waste management plan) and provided site supervision, asbestos/ORM abatement, demolition, and site restoration.
  • Operated contractor-owned excavator with shears and long stick to deconstruct the building; crushed concrete for reuse and recycling.
  • Submitted permits to SC DHEC and EPA for ACM abatement of over 39,000 F of non-friable and friable material, lead in demolition, and PCB/mercury disposal; hired temporary SC DHEC-licensed abatement workers to complete project on schedule.
  • Recycled 1,200 tons of concrete, 215 tons of scrap metal, and disposed of 940 tons of C&D waste.
  • Obtained approvals from SC DOT for sidewalk/road closures during the project.
  • Self-performed 78% of the total cost.

Project Details

Location of Project

Florence, SC

Awarded

07/01/2019

Completed

10/11/2019

Contract Value

$522,158

REFERENCE

Clint Moore
City of Florence
924 W. Evans Street
Florence, SC 29501
843.665.3113
cmoore@cityofflorence.com

Project Gallery

Committed to an injury-free workplace

We are unwavering in our dedication to ensure zero injuries at every job site. To do this, we follow strict safety guidelines and hire skilled contractors to work on our projects. Staying committed to operating an injury-free workplace is the right choice and the only choice.

Let’s talk about your project.

Only takes a few seconds!