Project Profile · Commercial
Former Florentine Building Abatement and Demolition
An 8-story building taken down on a tight downtown site. Target Contractors provided abatement and demolition of an 8-story, 31,146 SF mixed-use residential and commercial building in downtown Florence, SC, with road and sidewalk closures coordinated with the state DOT.
Project highlights
- 8-story, 31,146 SF mixed-use building
- Tight downtown site with road and sidewalk closures
- Long-reach excavator with shears and a long stick
- Concrete crushed for reuse and recycling
- Temporary licensed abatement workers added to hold the schedule
Project profile
- ClientCity of Florence
- LocationFlorence, South Carolina
- MarketCommercial
- ServicesAsbestos and regulated material abatement, demolition, site restoration
Taking Down an 8-Story Florence Building
What the project covered
Target provided abatement and demolition of an 8-story, 31,146 SF mixed-use residential and commercial building in downtown Florence, South Carolina, for the City of Florence. Scope covered asbestos and regulated material abatement, demolition, and site restoration.
What made the site demanding
The building stood on a tight downtown site, with road and sidewalk closures coordinated with the state DOT. A tall building on a small footprint leaves little room to work, so the sequence was planned around the site.
Why our team fit the job
A long-reach excavator with shears and a long stick took the building down in a controlled sequence. Concrete was crushed for reuse and recycling, and temporary licensed abatement workers were added to hold the schedule.
Tall Building, Small Site
Careful planning is what lets a tall building come down on a small site.
Planning a project with similar conditions? We would love the opportunity to take a look. Tell us about the site and we will talk through how we would plan it.





