Work organized by what you’re facing. Each profile shows the site, the challenge, and how we planned and delivered the work, from ongoing work on an active federal campus to terminal demolition and the controlled explosive demolition of a high-rise. Browse by capability or by market to find work close to yours.

Featured projects

See how the work gets planned and delivered.

Each profile follows the same order: a summary of the project, its highlights, the client and scope, and what the project shows about how we work.

Redevelopment · Controlled demolition

Lashkowitz High Rise, Fargo, ND

Precision implosion in a dense urban environment to clear a site for redevelopment, with 96% of waste diverted from landfills.

Federal & Defense

NASA Marshall Space Flight Center

Asbestos abatement and implosion of an 11-story, 233,519 SF building on an active federal campus.

Federal & Defense

MCAS Cherry Point

Abatement, demolition, recycling, and site restoration of 14 facilities totaling 275,000 SF.

All project profiles

Browse by market

Tower at the moment of a controlled implosionFederal & DefenseNASA Marshall Space Flight CenterAsbestos abatement and implosion of an 11-story, 233,519 SF building.Boom lift beside a steel-framed hangar being dismantledFederal & DefenseMCAS Cherry PointAbatement, demolition, recycling, and restoration of 14 facilities, 275,000 SF.Excavator at a demolition siteManufacturingEngineered Wood Products FacilityStructural demolition, asset recovery, and site restoration of a former OSB plant.Excavator working at a partly demolished structureManufacturingPaper Manufacturing DecommissioningDecommissioning, asset recovery, and structural demolition of a former paper mill.Photo coming: process plant or tank farmHeavy Industrial & ChemicalMemphis Industrial Tank FarmCaustic tank farm demolition inside an operating industrial site.Excavator and debris at an industrial plant in TexasHeavy Industrial & ChemicalIndustrial Rubber Manufacturing FacilityA salvage and demolition execution plan for a decommissioned rubber plant.Photo coming: tank farm, Harvey, LAEnergy & PetrochemicalKinder Morgan NOLA Tank FarmEight storage tanks and their foundations removed inside an active terminal.Concrete tank base rubble and an excavator at a terminalEnergy & PetrochemicalFormer Kinder Morgan TerminalStorage tanks and equipment removed from a former petroleum terminal, with salvage maximized.Excavator with a long boom taking down a multi-story buildingCommercialFormer Florentine BuildingAn 8-story, 31,146 SF building taken down on a tight downtown site.Excavator and water spray beside a campus clock towerCommercialClemson University Campus RedevelopmentAbatement and demolition of six university buildings on an active campus.Aerial view of a courthouse demolition siteCommercialSpartanburg Courthouse DemolitionA historic courthouse demolished beside an operating courthouse.Aerial view of a high-rise tower in Fargo, North DakotaRedevelopmentLashkowitz High RiseImplosion of a 22-story residential tower in a congested downtown.Photo comingRedevelopmentJamestown Mall RedevelopmentDemolition that cleared a well-known commercial property for redevelopment.